Thursday, July 17, 2008
Catch Up Post
July 6
Panahachel-The whole Caltech group went to Pana and did tourist activities. For those of you that were interested, I gave Kramer, the chicken, to Annie to give to her homestay family as a gift. It was well recieved and a small girl is now in charge of taking care of him.
July 7
Picking up the chair
Today we stopped by Centro Maya to pick up the chair. Other children at Centro Maya had a variety of disabilities. We took the dimensions of one boy, and Centro Maya gave us the ages and weights of all of their students.
July 8th
Tom and I spoke with Craig San Peitro about the long term prospects of chair. Craig is possible future donor, and recommended moving to Chinese manufacturing as soon as possible. Craig was very concerned about the big picture, seemed very interested in funding the project if we had a solid plan for 50K. He asked us many questions about the design, and challenged us to think about what the chair would look like if we had a Chinese manufacturer ready to build 100K chairs and an $8 million funder.
July 9th
Toured a Brocolli Plant and visited Landivar University.
July 10th
We flew to Tikal, and Tom and I toured Tikal with Craig. We spoke with Ken, Craig, Chris, and Luzmie about the wheelchair project in the pool afterward (2-3 hours). We agree to still remain committed to the 7-10 chairs for this summer to avoid an engineering iteration black hole that Ken is concerned we are entering. We agree that it is quite important to get in contact with a Chinese manufacturer in any manner possible to help us scope out the next step, so we know what type of manufacturing we should shoot for in our design. Luzmie suggest the UNDP (the UN) for possible grant money.
On the side, Tom will search for contacts to look into Chinese manufacturing. Also, we have some ideas on how to start using old bicycles again. From Kurt, we learned that the problem that our design solved most effectively was axles and bearings. If we could take old bikes and harvest the back seat post and front fork assembly, and then use a Whirlwind set of bent tubes in between. A jig could easily be made to handle these parts, and the proper pedal and front fork assemblies are the most common. Tom will start looking into used bike sourcing.
July 11
Ken suggests talking with an American wheelchair manufacturer, possibly Quickie. Could they use their brand, and open up a new market for them? Possibly a project for the wheelchair project in E 105 to look into bulk manufacturing and partnering with an American manufacturer. Feel free to contact Ken to look into the contacts. Look into marketing and distribution. Possibly have an E 102 group to look into more options for a business plan for the Wheelchair group.
July 12
Went River Rafting.
July 13
Drove back to Antigua.
July 14
Started making chair thinner, needed to buy a drill bit and bolts in the afternoon, found both in shops in Antigua.
July 15
Finished making chair thinner, started Spanish lessons.
July 16
Installed brakes and attached the footrest, the chair should be ready to go now. I would like to keep it on hand in Antigua as a reference to construct the next few chairs, so I don't want to rush it to Delfina. The size is down to 25 inches from 28.5. The guys in the shop think that it is easier to push, and the way thinned the chair seemed to make it more stable. They still have a few problems with the chair.
July 17
Today I started breaking down the bikes, and made a simpe jig to aid in the angled frame cut. It looks like the Vecesa bikes should work out for the chair.
Tuesday, July 15, 2008
July 5: Checking up on Delfina
This morning we went to the Santa Clara market, it was quite a scene. Tom and I bought a little chicken and we named it Kramer. All of the ladies seem to love Kramer.
We were there mainly just to have fun, but we saw a handicapped woman and asked her some questions about whether or not she would like a wheelchair. She could make 40Q a day as a beggar, and she would only use our chair if it would help her make more money in a job. She used one hand in a shoe to slide herself on a rubber mat around the market, and she was surprisingly fast.

After the market, we went down to San Juan La Laguna and met up with Paulina. She helped us speak with Delfina today, since Juan Carlos decided to stay in Pasajquim after the market.
We dropped in on Delfina at Centro Maya, and she had stopped using our chair. Her comments:
- The chair was too wide. Delfina actually competes in wheelchair races in her Wheelchair Foundation Chair that she does not like, but still wins. The width made her get very tired, and prevented her from using her bathroom at home. Her chair width currently is 23” and we are 28.5”
- She did like the wheels. The knobbiness helped her get over terrain, including the steep ramp down to her house.
- Sitting high, with the cushion and the big wheels Delfina felt a little unstable up so high off the ground.
- Back Pack- Her WF chair had a back pouch she could put stuff, and she liked that. It doesn't seem that difficult to include one of those in the upholstory for our chair.
- Arm Rests- She liked that the arm rests allowed her to move her arms freely and sit close to her desk for work.
- Tuk Tuk- The chair barely fit onto the Tuk Tuk that she takes from San Juan to San Pedro
- Caster Axle- The locking washer system loosened and locked up the castor. Her dad was able to fix it for her.
- Footrests- Delfina did not like the foot rests on her WF chair and stopped using them. We think thats why she did not use our footrests
- No brakes made it impossible for her to transfer to the chair by herself, and difficult to sit at a desk by herself.
Monday, July 14, 2008
July 4: distributing the chair
- She was the right size for the chair.
- She was an active user of the chair, having won several women's wheelchair races.
- She was employed as an accountant, so we could evaluate the effect of the chair on her work.
- She has a small commute, so she could test the folding mechanism of the chair.
- She met daily with Centro Maya, which had english speaking volunteers that were willing to help here fill out a detailed report on how the char suited her, and if need be she was literate and could write comments in spanish about the chair.

Another shot of Delfina in the tuk tuk.
Video clip of Delfina getting into the tuk tuk.
The ramp Delfina takes to get from her house to the road.
Later that day, we received a call from Delfina saying that one of the front caster wheels was bound up and couldn't move. We made our way to San Pedro, buying tools along the way. While visiting her to fix the problem, we got a little look into the inside life of Delfina, and what kind of terrain she has to navigate on a daily basis.
July 3
Pasajquim is about 1 hour 15 minutes away from San Juan La Laguna (pop 4500), the town where Luzmi identified Centro Maya, a school that takes handicapped students. For better or worse, on this day the entire school was 2 hours further at a workshop, so we would have to meet with them some other day.
While in San Juan, we noticed we had forgotten all of the footrest pieces for the wheelchair. We stumbled upon a bike shop in town. There we found two bike stems and a handlebar to make a new footrest. While we were there, we decided to check on their stock of bearings. This small bike shop in San Juan La Laguna, a relatively small town, carried replacement stem bearings for 3Q a pair! The stem bearings included the metal frame to hold all of the ball bearings in place. They were selling a pack of 144 pedal ball bearings for 10Q. This did not include the metal frame that holds them evenly spaced.
Bearing parts available in San Juan La Laguna on the left, bearing parts from our chair on the right.
Handlebars: 25 Q
Stem: 25 Q
New bike frame: 250 Q
New stem raceway parts: 15 Q
New front fork: 58 Q
Tires: 38 Q
Tubes: 14-17 Q
24” wheel: 70 Q
We still needed a piece of cloth to connect the two sides of the footrest. We went to a shoe store, and had a leather piece sewn for 25 Q.
Bearing replacement is essential for our chair, as the bearing used in cheap bicycles will wear out faster than bearings found in quality wheelchairs like the Transitions chair. Finding these bearings for a low price in a smaller town was very encouraging. The bearings that Transitions currently uses cost $2.50 per bearing, and although it is fairly common, it cannot be found as readily as replacement bicycle bearings. Finding a shop that could replace the footrest was also a good sign, since Kurt and the Transitions workers were concerned about the life of a cloth footrest.
The woman in Santa Maria who used a chair.
Juan Carlos conducting the interview.Sunday, July 13, 2008
July 2: Kurt Kornbluth
With the guys in the shop and Kurt we did a brainstorm session and they had the following concerns:
Width- Our Chair will have problems getting through some doors, and pushing with your hands that far out is much more tiring. This is a deal breaker for our chair.
Camber- Advanced users will be reluctant to use a chair without camber, because they automatically identify it as an inferior chair. It also helps stability.
Footrest- They claim the cloth though sturdy will wear out. Also, footrest needs a heel strap and angle so the feet slightly favor sliding back to the chair.
Weight- Our chair now weighs about 38-40 lbs which is better than the 50+ 3rd prototype.
Leg Angle- A 90 degree angle for first time users is bad.
Allen bolts- Kurt said that allen wrenches are harder to find and they strip easier.
We did two of the whirlwind tests, which are designed to mimic the ANSI/RESNA testing specifications. Ours passed the caster bending test with flying colors. The whirlwind chair that transitions currently makes didn't even pass this test.
We then did a drop test, where we loaded the chair with 200Lbs of sand, and proceeded to push it at a fast walking pace off of a 7” curb. Kurt marked the x-brace height, and then put crosses on various parts of the chair and took measurements. This would allow distortions to be measured before and after. The chair fared well, however the ½ inch diameter axles ended up significantly bent. We need to get some hardened steel bolts to prevent this, as Kurt recommended.
Tom doing the drop test.
Kurt showing our bent axle after the drop test.
Kurt was a little concerned about wobble of our wheels. He suggested welding or brazing the bolt to the wheel hub to create better stability.
Hugo performing his own style of drop test with our chair.
Kurt was a really cool guy and knew what he was doing. He comes to Guatemala quarterly to check on his wind energy project, Humdinger. He could be good as a consultant that checks up on our wheelchair from time to time. Right now he is starting up a large program at UC Davis for the developing world. He said that we were welcome to visit him at any time.
Saturday, June 28, 2008
Week Wrap-up
This week, Transitions was building a new model of chair in a hurry for Kurt Kornbluth. I think they got started on either Monday or Tuesday of this week, and they were able to finish construction (without painting, but including upholstery) by the end of the day on Thursdsay---only 3 or 4 days! They did use an extra pair of casters that they had lying around the shop which sped things up a bit, but they did not have any jigs for this version of the chair. This gives us a ballpark idea of how long it takes them to build a brand new chair. I think my goal of getting one IMI chair done the week I get back from San Juan La Laguna is reasonable, based on this example.
The manual that they were using to construct the new chair was incredibly detailed. It looked like it was about 100 pages thick, minimum. Every component had its own part drawing from solidworks. Hugo told me that as our manual stands now, the guys in the shop would not be able to build our chair. Hugo said we need to add many more specific dimensions and drawings for our manual to be useful. To be fair, however, since we are switching bike frames down here, it was hard to include all of the necessary specifics in our last manual. Anyway, when it comes time to put the “final” manual together, I think we will need to tap into Charlie's expertise with solidworks.
I g-chatted with Hans, and he will be able to order some parts for the MIG welder that I couldn't find here in Guatemala and bring them down to the Transitions shop when he arrives mid-June. Dan or Tom, I guess one of you should reimburse him, depending on which set of funds you determine to use. The MIG welding skills of the workers in the shop are limited. They can use the MIG welder to tack things together, but they have trouble laying down a longer weld without burning through a pipe. They are excited to learn more, and are looking forward to Hans' visit.
It turns out that my Hotel is next door to a bike parts store. If we ever need a particular part in a hurry, I know where to go. The price for a 24” mountain bike wheel was Q70 (just under $10), about half as much as we paid for the same part ($19.99) at a Incycle Bicycle in Pasadena.
-Joey
Thursday, June 26, 2008
Supply Shopping
We met up with Paulina in the Guatemala City. Puli postponed a meeting with her boss at her other job to accompany us today. She had called around to variety of hardware stores to find the best deals yesterday. I ended up buying:
*a sandblaster
*a disk and belt sander combo
*welding wire
*6 Vecesa Mountain Bikes at 565 Quetzalas each
This should be enough materiel to get a solid start building chairs. Friday is a Holiday for guys at Transitions. July 1 is Army Day in Guatemala, but its also the day the Y group comes to visit, so Alex is switching the Holiday for the guys that work in the shop so that the shop will be open when the Y comes to visit.
The prices on the bikes were not great. The bikes were well over Q600, but because we bought 6, they gave us a discount. We bought the bikes from a Vecesa retail store, and we didn't talk to anyone about a long term deal. The deal with Vecesa is something that we will need to work on more throughout the summer.
-Joey
Meeting with John Bell
* They think it is more reasonable to buid 3 IMI chairs over the summer, rather than the 10 I was shooting for. (I realize that it is pretty hard to build wheelchairs, and things take a long time in Guatemala, but I think I can do better than 3 chairs. 10 chairs is still the ambitious goal.)
* They wanted me to build/help build 1 Whirlwind chair to see how it is done. (This might not be a bad idea, but I feel as though I already have a good handle on how Transitions builds chairs, based on the information Jeff, Tom, and I took away from our previous visits.)
* They suggested building and testing one baskteball chair, and building a jig for a basketball chair. (This sounds like fun, but not really in the interest of IMI for the summer.)
* They suggest that I do the bulk of the construction earlier in the summer, rather than later. (I will see how things go, but this seems like a very good suggestion.)
* They mentioned that my plan may require more workers that just Hugo. I may need another technician to help me with my work. (I am not sure if this is the case yet, but if it is, do we have the funds available to do this?)
* Kurt Kornbluth is visiting the Transitions shop on July 2. (They believe it is essential for him to help test the chair before we send it out for user feedback. I think this is a great idea and opportunity. Tom will also be down at that time. If we get a thumbs up from Kurt, it should also be a great for fund raising.)
John was just about to leave to the US and Canada for some fundraising, it seems as though they are extremely tight on cash.
I toured the shop after the meeting, checking out the supplies and tools that they had.
We can buy any materials Transitions has on hand from Transitions. Hugo is getting me a price list. They have plenty of materials for entire x-brace setup and for the complete push rim assembly. They have a mold for the front caster wheels, and they get those made from a local rubber company.
They have all of the upholstery materials, except for the thin, firm cushion that is used in the backrest. Tom will be able to bring down some for the first few chairs, and if we need more, I am sure Hans can bring it down in mid July.
Some things that I noticed they would need for shop, that I plan on buying in Guatemala city with Puli's help:
* Disk Sander or belt sander, something to make the angled surface front fork for the casters.
* Some type of sander to make the concave edges for pipes we want to weld together.
* Sandblaster or abrasion disk, to remove paint from the bike frames for welding purposes.
* Welding wire and gas refill (to get one MIG welder working—if I want to get another welder working, we need welding wire, gas refill, a new plug to fit a different outlet, and an additional welding mask)
* A small tool to clean up the welds.
* an extra hack saw
I am not sure how much these things will cost.
This afternoon I found some spanish lessons that look promising, and I looked into some places to stay longer term.
Thanks for reading the long post, I am sure my these will get shorter as the sumer wears on.
-Joey
Monday, June 23, 2008
Guatemala
- Tuesday- Meet with Transitions, including John Bell, and Puli, in the morning. In the afternoon, check out the shop again, look at what supplies we need to purchase. I will ask the guys in the shop to do the upholstery work for the two chairs Tom will bring down next week
- Wednesday- I bus to Guatemala city, meet Paulina, and go bicycle and other supplies shopping. Paulina has looked into getting a truck from a friend to transport bikes. If we can manage to get the bikes at a good price, we will try to buy enough for the summer. If we can't negotiate a good deal this week, we will just buy 6 bikes to get started, and work on negotiating a better price by working with Gabriel and his contacts.
- Thursday- Look into Spanish lessons and a more permanent living situation for the summer.
- Friday- Finish up any shopping for supplies, work in the shop and evaluate the welding situation.
-Joey