This morning Puli and I went to Transitions and had a meeting with John Bell, Alex, and Hugo. They all had some good comments. In particular, they had some comments about my schedule:
* They think it is more reasonable to buid 3 IMI chairs over the summer, rather than the 10 I was shooting for. (I realize that it is pretty hard to build wheelchairs, and things take a long time in Guatemala, but I think I can do better than 3 chairs. 10 chairs is still the ambitious goal.)
* They wanted me to build/help build 1 Whirlwind chair to see how it is done. (This might not be a bad idea, but I feel as though I already have a good handle on how Transitions builds chairs, based on the information Jeff, Tom, and I took away from our previous visits.)
* They suggested building and testing one baskteball chair, and building a jig for a basketball chair. (This sounds like fun, but not really in the interest of IMI for the summer.)
* They suggest that I do the bulk of the construction earlier in the summer, rather than later. (I will see how things go, but this seems like a very good suggestion.)
* They mentioned that my plan may require more workers that just Hugo. I may need another technician to help me with my work. (I am not sure if this is the case yet, but if it is, do we have the funds available to do this?)
* Kurt Kornbluth is visiting the Transitions shop on July 2. (They believe it is essential for him to help test the chair before we send it out for user feedback. I think this is a great idea and opportunity. Tom will also be down at that time. If we get a thumbs up from Kurt, it should also be a great for fund raising.)
John was just about to leave to the US and Canada for some fundraising, it seems as though they are extremely tight on cash.
I toured the shop after the meeting, checking out the supplies and tools that they had.
We can buy any materials Transitions has on hand from Transitions. Hugo is getting me a price list. They have plenty of materials for entire x-brace setup and for the complete push rim assembly. They have a mold for the front caster wheels, and they get those made from a local rubber company.
They have all of the upholstery materials, except for the thin, firm cushion that is used in the backrest. Tom will be able to bring down some for the first few chairs, and if we need more, I am sure Hans can bring it down in mid July.
Some things that I noticed they would need for shop, that I plan on buying in Guatemala city with Puli's help:
* Disk Sander or belt sander, something to make the angled surface front fork for the casters.
* Some type of sander to make the concave edges for pipes we want to weld together.
* Sandblaster or abrasion disk, to remove paint from the bike frames for welding purposes.
* Welding wire and gas refill (to get one MIG welder working—if I want to get another welder working, we need welding wire, gas refill, a new plug to fit a different outlet, and an additional welding mask)
* A small tool to clean up the welds.
* an extra hack saw
I am not sure how much these things will cost.
This afternoon I found some spanish lessons that look promising, and I looked into some places to stay longer term.
Thanks for reading the long post, I am sure my these will get shorter as the sumer wears on.
-Joey